KRYPTO

MINUTES - TEAM MEETING 09 - SUMMER 2001
07/26/2001


Agenda Team Meeting
Participants Pisey Huy (Time Keeper)
Ming-hsun Liu (Minute Taker)
Grace Lewis (Facilitator)
Topics
  • Review Open Action Items
    • Close every item except 191 and 189
  • Status 
    • Krypto team is on schedule in terms of earned value (67.27%).
    • The schedule so far is ok, but we may fall off the schedule next week because we haven't got the write/delete capability done yet. 
  • Web Page Review
    • Some small things needs to be changed
      • Link is needed to the download from of NDBS 2.0.  Will have to contact client for information on where the download information is stored and a new CGI script is needed.
      • Change the introduction to switch to the description page after a certain second.
  • EOSP Slides Review
    • Small things needs to be changed
      • Insert verbs and nouns to make it clearer
      • Add sub-bullets to the issues slides
      • Add more items to the deliverables slide
      • Changed the implementation issues to issues and solutions slides
      • Add pie chart for effort in each development phase (100% Java and write/delete capability)
      • Add EV slide as backup
      • Other minor issues are write on the draft EOSP slides
      • Need to look into keytool as a demo option if DIRS does not work.
 Action Items
  • Grace - Write list of issues for write/delete to put on programmer's guide and Web page.
  • Grace - Update EOSP slides
  • Grace - Talk to Clare Dixon for TN number
  • Grace - Take screen shots of DIRS for demo for it expires
  • Cliff - Send tag to Pisey on mega tag that enable a page to switch to another page after a certain time.
  • Pisey - Link NDBS 2.0 Web site from Krypto Web site
  • Pisey - Update NDBS 2.0 Web site
  • Pisey - Send email to client on download form for NDBS 2.0