| Topics |
-
Review Open Action Items
-
Action item 183, 189, 191, and 9 remain open
-
Action item 185, 186, 187 are closed.
-
Status
-
Krypto team is on schedule in terms of earned value (62.73%).
-
Scott completed his research into the errors with certificate format.
It is an exception that is not handled by the CertificateFactory.generateCertificate()
method when it encounters an invalid certificate (one with an empty string
in the Generalnames sequence, in an AlternativeName extension).
-
The installation guide will be sent to the French guy along with NDBS 2.0.
-
A Programmer's Guide was created and is included in the NDBS zip file.
-
John Foreman wants the TN on July 30, 2001 and it will not be ready by
August 3, 2001, date we hand over the TN to the SEI. Therefore, John
Foreman will see the final version of TN and someone in charge of the TN
will add his comments later.
-
Cliff is on vacation next week and therefore no mentor meetings.
-
Web Page Content
-
NDBS 2.0 Web page outline was reviewed by Cliff at the meeting.
-
Cliff provided the following comments on the Web page format:
-
Separate each section into its own page.
-
Add megatag for certain keywords for searching purposes.
-
Create bug report form - depends on future of NDBS 2.0.
-
Add feedback section and check on contact for feedback.
-
Add download to NDBS 1.0 original download.
-
Lessons Learned
-
Team brainstormed a list of lessons learned for NDBS 2.0 development and
provided an outline to Cliff for suggestion.
-
Team discussed lessons learned such as how useful was TSP (only good for
pointing our the specific roles since we are a small team).
-
Review action items
-
Ten new action items were created.
|