KRYPTO

MINUTES - TEAM MEETING 11 - SPRING 2001
05/03/2001



 
 
 
 
Agenda Team Meeting
Participants Cliff Huff
Pisey Huy (Minute Taker)
Ming-hsun Liu (Facilitator)
Grace Lewis (Time Keeper) 
Topics
  • Review Open Action Items
    • Action items 158 remains open.
  • Review EOSP Slides
    • Ming is responsible for making the suggested changes.
    • Items of discussion include:
      • Merge the risk migitation slides into 1
      • Add an architecture slide (may have to include a slide explaining the  architecture) and explains the costs/benefits and analysis strategies of the architecture.
      • Delete the NDBS feature slide and include the first bullet on this slide onto the previous slide.
      • Other are minor clarification/comments to the slides.
  • Status of Detailed Design Documentation
    • Pisey showed Cliff the Detailed Design document which includes the spec and the comments from Rose Model.
    • Detailed Design document will be reviewed by Cliff.
  • PSM Decision
    • Grace found that we have all the code for write/delete capability.
    • Grace feels that we should at least give the write/delete capability a try, but not fully commit to the client that we will completed it because of time constraint and priority.  As a result of our attempt, we will provide to the client any documentation that we found.  Grace also feels that the write/delete capability will take as much time as the C code conversion to Java classes.
    • All team members agree that we will let the client know this (try, but no guarantees of completion).
    • Pisey will send message to the client to confirm on the last client liaison date.  If the client is unable to attend, Grace will send an email with the findings to Ming which he will then send to the client (team lead responsibility).
 Action Items
  • Grace: Send email about the PSM to Ming, if no client liaison on May 8, 2001.
  • Ming: Update the EOSP slides.
  • Ming: Add PSM information the PSM document that Grace created.
  • Pisey: Update the Detailed Design document after Cliff's review.
  • Cliff: Review the Detailed Design document and return to Pisey.
  • Cliff: Provide Monday, May 7th schedule availability for dry-run to team.