Resource Start WBS Name Work Estimate Actual % Complete Duration Actual Finish Finish Predecessors Counts? PV EV
0 29-May 0 Gryphon Cycle 5 814 hrs 0 0 75% 36 days NA 3-Jul 0 No 0 0
0 29-May 1 Overhead Rollup 217 hrs 0 0 91% 28 days NA 25-Jun 0 No 0 0
0 29-May 3 Data model 75 hrs 0 0 54% 14 days NA 11-Jun 0 No 0 0
0 29-May 3.1 GZAPS 0.1 Presentation 75 hrs 0 0 54% 14 days NA 11-Jun 0 No 0 0
0 29-May 4 SRS Main document Rollup 74 hrs 0 0 25% 35 days NA 2-Jul 0 Yes 0 0
0 29-May 4.3 Prototype Document Rollup 20 hrs 0 0 29% 22 days NA 19-Jun 0 Yes 0 0
0 29-May 4.5 Prototype 4 Documentation roll up 21 hrs 0 0 38% 18 days NA 15-Jun 0 Yes 0 0
0 29-May 5 Prototype 4 Rollup 70 hrs 0 0 100% 12 days NA 9-Jun 0 Yes 0 0
0 29-May 5.2 Displaying tree nodes' properties Rollup 22 hrs 0 0 100% 10 days NA 7-Jun 0 Yes 0 0
0 29-May 5.5 Markup and UI Rollup 13 hrs 0 0 100% 6 days NA 3-Jun 0 Yes 0 0
AZ 29-May 1.1 Overhead 20 hrs 20 18 90% 28 days NA 25-Jun 0 No 0 0
0 29-May 3.1.3 GZAPS 1.0 Presentation Rollup 18 hrs 0 0 100% 1 day NA 29-May 0 No 0 0
0 29-May 3.1.5 Integration with the Dave’s Data Model 30 hrs 0 0 43% 14 days NA 11-Jun 0 No 0 0
0 29-May 3.1.5.1  First Pass roll up 11 hrs 0 0 100% 5 days NA 2-Jun 0 No 0 0
0 29-May 3.1.5.4 Database update/maintenance Rollup 4 hrs 0 0 50% 1 day NA 29-May 0 No 0 0
0 30-May 3.1.4 GAZPS 0.1 revision 23 hrs 0 0 75% 2 days NA 31-May 36 No 0 0
0 3-Jun 3.1.5.2 Second Pass Rollup 9 hrs 0 0 25% 5 days NA 7-Jun 52 No 0 0
0 5-Jun 5.6 Integration Rollup 18 hrs 0 0 100% 5 days NA 9-Jun 0 Yes 0 0
0 6-Jun 2 RRLOE Tasks Rollup 32 hrs 0 0 31% 6 days NA 11-Jun 0 No 0 0
0 6-Jun 2.1 RRLOE Data Model Study Rollup 12 hrs 0 0 100% 2 days NA 7-Jun 0 No 0 0
0 6-Jun 4.4 Prototype User Manual Roll up 23 hrs 0 0 22% 27 days NA 2-Jul 0 No 0 0
0 6-Jun 2.1.1 RRLOE Initial Meeting Rollup 6 hrs 0 0 100% 1 day NA 6-Jun 0 No 0 0
0 8-Jun 2.2 Communication w/ RRLOE Team 10 hrs 0 0 0% 2 days NA 9-Jun 18 No 0 0
0 8-Jun 3.1.5.3 Data Model Requirement’s Document Revision Rollup 6 hrs 0 0 0% 4 days NA 11-Jun 56 No 0 0
0 10-Jun 2.3 RRLOE/GZAPS Map Construction 10 hrs 0 0 0% 2 days NA 11-Jun 23 No 0 0
AZ 29-May 1.12 Planing manager overhead 20 hrs 20 25 90% 28 days NA 25-Jun 0 No 0 0
AZ 29-May 3.1.3.1 GZAPS 1.0 Presentation 3 hrs 3 2.5 100% 1 day 16-Jun 29-May 0 No 0 0
AZ 29-May 5.3 SQL transaction investigation 5 hrs 5 6 100% 2 days 11-Jun 30-May 0 Yes 300 300
0 13-Jun 6.3 P5 class strcuture Rollup 26 hrs 0 0 100% 4 days NA 16-Jun 0 No 0 0
0 13-Jun 6 Prototype 5 Rollup 153 hrs 0 0 80% 19 days NA 1-Jul 0 Yes 0 0
AZ 10-Jun 10.1.1 Prototype 4 Demo meeting 3 hrs 3 2 100% 1 day 11-Jun 10-Jun 98 No 0 0
0 17-Jun 6.4 GZAPS 1.0 database interface Rollup 16 hrs 0 0 100% 2 days NA 18-Jun 0 No 0 0
AZ 12-Jun 4.4.6 Review User Manual 2 hrs 2 0 0% 1 day NA 12-Jun 84 No 0 0
AZ 17-Jun 6.4.3 Database interface 4 hrs 4 0 100% 1 day NA 17-Jun 127 No 0 0
0 20-Jun 4.2 Review SRS Main Documents Rollup 4 hrs 0 0 0% 1 day NA 20-Jun 75 Yes 0 0
0 27-Jun 6.8 Integration Rollup 24 hrs 0 0 100% 5 days NA 1-Jul 0 No 0 0
AZ 24-Jun 6.1.4 Manipulate the Tree Components 2 hrs 2 2 100% 1 day NA 24-Jun 135 Yes 120 120
AZ 25-Jun 6.1.5 Explore muliple tabs and other GUI elements 6 hrs 6 3 100% 2 days NA 26-Jun 121 Yes 360 360
0 17-Jun 8.2 HLA Draft Version Rollup 12 hrs 0 0 0% 2 days NA 19-Jun 153 No 0 0
AZ 27-Jun 6.8.1 Integration 15 hrs 15 12 100% 3 days NA 29-Jun 134,127,135,139,122 Yes 900 900
0 15-Jun 8.3 Architecture Presentation Rollup 16 hrs 0 0 0% 2 days NA 17-Jun 147 No 0 0
AZ 2-Jul 7 Plan for Cycle 6 Rollup 8 hrs 8 4 50% 2 days NA 3-Jul 142 Yes 480 0
BL 29-May 1.13 QA manager overhead 4 hrs 4 5 90% 28 days NA 25-Jun 0 No 0 0
BL 29-May 1.2 Overhead 20 hrs 20 13.5 90% 28 days NA 25-Jun 0 No 0 0
BL 29-May 1.8 Studio matrix Overhead 32 hrs 32 42.1 90% 28 days NA 25-Jun 0 No 0 0
0 21-Jun 9.2 High Level Design Documentation Rollup 16 hrs 0 0 0% 1 day NA 22-Jun 0 No 0 0
BL 29-May 3.1.3.2 GZAPS 1.0 Presentation 3 hrs 3 2.5 100% 1 day 16-Jun 29-May 0 No 0 0
0 21-Jun 9.2.1 HLD Initial Version Rollup 16 hrs 0 0 0% 1 day NA 22-Jun 0 No 0 0
0 19-Jun 8.4 Architecture Review Rollup 6 hrs 0 0 0% 1 day NA 20-Jun 150 No 0 0
0 13-Jun 6.2 Port P4 to GZAPS 1.0 Rollup 16 hrs 0 0 100% 7 days NA 19-Jun 0 No 0 0
BL 29-May 5.2.1 Define a structure to store attributes in the tree 6 hrs 6 10.5 100% 4 days 11-Jun 1-Jun 0 Yes 360 360
BL 31-May 4.3.3 Review Proto 1,2,3 document 2 hrs 2 0 0% 1 day NA 31-May 77 Yes 120 0
BL 2-Jun 5.2.2 Explore Data visualization OCX's for the grid control 8 hrs 8 8 100% 4 days 11-Jun 5-Jun 101 Yes 480 480
0 21-Jun 9 High Level Design Rollup 37 hrs 0 0 0% 3 days NA 24-Jun 146 No 0 0
BL 6-Jun 5.2.3 Create data visualization prototype 8 hrs 8 3.5 100% 2 days 11-Jun 7-Jun 102 Yes 480 480
BL 12-Jun 4.4.4 Review User Manual 2 hrs 2 0 0% 1 day NA 12-Jun 84 Yes 120 0
BL 12-Jun 8.1.1 HLA Initial Version 6 hrs 6 1 100% 3 days 11-Jun 14-Jun 0 Yes 360 360
BL 13-Jun 6.3.2 P5 class structure 6 hrs 6 8.67 100% 4 days NA 16-Jun 0 No 0 0
BL 14-Jun 4.5.3 Review Proto 4 document 2 hrs 2 0 0% 1 day NA 14-Jun 92 Yes 120 0
BL 15-Jun 8.3.1 Architecture Presentation Meeting 4 hrs 4 0 0% 2 days NA 16-Jun 0 Yes 240 0
BL 17-Jun 8.2.1 HLA Draft Version 6 hrs 6 0 0% 2 days NA 19-Jun 0 Yes 360 0
BL 19-Jun 4.3.1 Finish Proto1,2 documents 6 hrs 6 0 0% 1 day NA 19-Jun 0 Yes 360 0
0 20-Jun 8.5 Architecture Revision Rollup 3 hrs 0 0 0% 1 day NA 21-Jun 158 No 0 0
0 24-Jun 6.1 Module and Below Rollup 33 hrs 10 0 45% 8 days NA 1-Jul 0 Yes 600 0
BL 19-Jun 8.4.1 Architecture Draft Review 2 hrs 2 0 0% 1 day NA 20-Jun 0 Yes 120 0
BL 20-Jun 4.2.1 Review SRS Main Document 1 hr 1 0 0% 1 day NA 20-Jun 0 Yes 60 0
BL 20-Jun 8.5.1 Architecture Document Revision 3 hrs 3 0 0% 1 day NA 21-Jun 0 Yes 180 0
BL 21-Jun 4.1 Finish SRS Main Document 6 hrs 6 0 0% 1 day NA 21-Jun 70 Yes 360 0
BL 22-Jun 9.1.1 High Level Design, Initial Meeting 3 hrs 3 0 0% 1 day NA 23-Jun 0 Yes 180 0
0 23-Jun 9.3 HLD Draft Version Rollup 12 hrs 0 0 0% 1 day NA 24-Jun 165 No 0 0
BL 24-Jun 6.1.1 Parsing and Saving the Tree 8 hrs 8 0 0% 3 days NA 26-Jun 135 Yes 480 0
0 24-Jun 6.7 Populate Database Rollup 16 hrs 0 0 100% 3 days NA 26-Jun 138 Yes 0 0
BL 27-Jun 6.1.2 Tree printing 3 hrs 3 17.5 100% 1 day NA 27-Jun 118 Yes 180 180
BL 28-Jun 6.1.3 GUI 10 hrs 10 16 0% 3 days NA 30-Jun 119 Yes 600 0
BL 1-Jul 6.1.6 Buffer time 4 hrs 4 0 100% 1 day NA 1-Jul 120 No 0 0
0 12-Jun 8 Architecture Documentation Rollup 49 hrs 0 0 27% 9 days NA 21-Jun 0 No 0 0
GT 29-May 1.14 Process manager overhead 4 hrs 4 0.5 90% 28 days NA 25-Jun 0 No 0 0
GT 29-May 1.3 Overhead 20 hrs 20 17 90% 28 days NA 25-Jun 0 No 0 0
GT 29-May 1.7 Studio matrix Overhead 8 hrs 8 9.5 90% 28 days NA 25-Jun 0 No 0 0
GT 29-May 3.1.3.3 GZAPS 1.0 Presentation 3 hrs 3 2.5 100% 1 day 16-Jun 29-May 0 No 0 0
GT 29-May 4.5.1 Draft Proto 4 content 5 hrs 5 7 100% 2.5 days 16-Jun 31-May 0 Yes 300 300
GT 29-May 5.5.1 Label at top of the screen 3 hrs 3 4 100% 2 days 11-Jun 30-May 0 Yes 180 180
GT 30-May 3.1.4.6 Meeting with KD 1 hr 1 0 100% 1 day 11-Jun 30-May 0 No 0 0
GT 31-May 4.3.4 Review Proto 1,2,3 document 2 hrs 2 0 0% 1 day NA 31-May 77 No 0 0
GT 31-May 5.5.2 scratch pad 5 hrs 5 10 100% 2 days 11-Jun 1-Jun 107 Yes 300 300
GT 2-Jun 5.5.3 Label control 5 hrs 5 2.5 100% 2 days 11-Jun 3-Jun 108 Yes 300 300
GT 5-Jun 5.6.1 Integration 5.2 6 hrs 6 0 100% 1 day 11-Jun 5-Jun 0 Yes 360 360
GT 6-Jun 5.6.2 Integration 5.3 4 hrs 4 1.5 100% 1 day 11-Jun 6-Jun 111 Yes 240 240
GT 7-Jun 5.6.3 Integration 5.4 2 hrs 2 0 100% 1 day 11-Jun 7-Jun 112 Yes 120 120
GT 8-Jun 5.6.4 Integration 5.5 2 hrs 2 2.5 100% 1 day 11-Jun 8-Jun 113 Yes 120 120
GT 9-Jun 5.6.5 Final Integration 4 hrs 4 2 100% 1 day 11-Jun 9-Jun 114 Yes 240 240
GT 11-Jun 4.5.2 Finalize Proto 4 content 6 hrs 6 2 50% 3 days NA 13-Jun 0 Yes 360 0
GT 14-Jun 4.5.4 Review Proto 4 document 2 hrs 2 0 0% 1 day NA 14-Jun 92 No 0 0
GT 15-Jun 4.5.7 Proto 4 documentation revision 2 hrs 2 0 0% 1 day NA 15-Jun 93 No 0 0
GT 15-Jun 8.3.3 Architecture Presentation Meeting 4 hrs 4 0 0% 2 days NA 16-Jun 0 No 0 0
GT 17-Jun 6.5 Fix all outstanding bugs in P4 4 hrs 4 1 100% 1 day NA 17-Jun 127 Yes 240 240
GT 20-Jun 6.6.1 Saving Module level and above 4 hrs 4 14 100% 1 day NA 20-Jun 124 Yes 240 240
GT 19-Jun 8.4.2 Architecture Draft Review 2 hrs 2 8 0% 1 day NA 20-Jun 0 No 0 0
GT 21-Jun 6.6.2 Saving module level and below 8 hrs 8 0 0% 3 days NA 23-Jun 136 Yes 480 0
GT 20-Jun 4.2.4 Review SRS Main Document 1 hr 1 0 0% 1 day NA 20-Jun 0 No 0 0
GT 21-Jun 9.2.1.1 HLD Initial Version 8 hrs 8 0 0% 1 day NA 22-Jun 0 Yes 480 0
SK 29-May 1.10 Support manager overhead 5 hrs 5 2.05 90% 28 days NA 25-Jun 0 No 0 0
SK 29-May 1.4 Overhead 10 hrs 10 4.16 90% 28 days NA 25-Jun 0 No 0 0
SK 29-May 1.9 Client Liaison Tasks 6 hrs 6 6 90% 28 days NA 25-Jun 0 No 0 0
SK 29-May 3.1.3.4 GZAPS 1.0 Presentation 3 hrs 3 2.5 100% 1 day 16-Jun 29-May 0 No 0 0
SK 29-May 4.3.2 Finish Proto 3 document   6 hrs 6 4.8 100% 2 days 11-Jun 30-May 0 Yes 360 360
SK 29-May 5.4 Fix registry key problem 4 hrs 4 0 100% 7 days 11-Jun 4-Jun 0 Yes 240 240
SK 31-May 4.3.5 Review Proto 1,2,3 document 2 hrs 2 0 0% 1 day NA 31-May 77 No 0 0
SK 6-Jun 4.4.1 Update Proto 3 User Manual 5 hrs 5 4.25 100% 2 days 11-Jun 7-Jun 0 No 0 0
SK 10-Jun 4.4.2 Update User Manual to Proto 4 5 hrs 5 0 0% 2 days NA 11-Jun 98 Yes 300 0
SK 12-Jun 4.4.5 Review User Manual 2 hrs 2 0 0% 1 day NA 12-Jun 84 No 0 0
SK 14-Jun 4.5.5 Review Proto 4 document 2 hrs 2 0 0% 1 day NA 14-Jun 92 No 0 0
SK 15-Jun 8.3.2 Architecture Presentation Meeting 4 hrs 4 0 0% 2 days NA 16-Jun 0 No 0 0
SK 20-Jun 4.2.3 Review SRS Main Document 1 hr 1 0 0% 1 day NA 20-Jun 0 No 0 0
SK 24-Jun 6.7.2 Populate Database 11 hrs 11 17.5 100% 3 days NA 26-Jun 124 Yes 660 660
0 20-Jun 6.6 Copy and Edit Rollup 18 hrs 0 0 63% 4 days NA 23-Jun 0 No 0 0
SK 2-Jul 4.4.3 Update User Manual to Proto 5 5 hrs 5 0 0% 1 day NA 2-Jul 116 Yes 300 0
SS 29-May 1.15 Development manager overhead 8 hrs 8 15 100% 28 days NA 25-Jun 0 No 0 0
SS 29-May 1.5 Overhead 20 hrs 20 16 90% 28 days NA 25-Jun 0 No 0 0
SS 29-May 3.1.1 Preparation for the Data Model presentation 2 hrs 2 0.5 100% 1 day 16-Jun 29-May 0 No 0 0
SS 29-May 3.1.3.5 GZAPS 1.0 Presentation 3 hrs 3 2.5 100% 1 day 16-Jun 29-May 0 No 0 0
SS 29-May 3.1.5.1.2  Dave’s Data Model Review 4 hrs 4 0 100% 5 days 16-Jun 2-Jun 0 No 0 0
SS 29-May 5.1 RRLOE import/export 8 hrs 8 3.25 100% 2 days 11-Jun 30-May 0 Yes 480 480
SS 30-May 3.1.4.1 Data Model review meeting 6 hrs 6 1.2 100% 1 day 11-Jun 30-May 0 Yes 360 360
SS 30-May 3.1.4.4 Meeting with KD 3 hrs 3 4 100% 1 day 11-Jun 30-May 0 Yes 180 180
SS 31-May 4.3.6 Review Proto 1,2,3 document 2 hrs 2 0 0% 1 day NA 31-May 77 No 0 0
SS 3-Jun 3.1.5.2.2  Data Model Review 1 hr 1 0 0% 5 days NA 7-Jun 0 Yes 60 0
SS 6-Jun 2.1.1.1 RRLOE Initial Meeting 3 hrs 3 2.5 100% 1 day 11-Jun 6-Jun 0 Yes 180 180
SS 6-Jun 2.1.2 RRLOE Data Model Study 6 hrs 6 2 100% 2 days 11-Jun 7-Jun 0 No 0 0
SS 8-Jun 2.2.1 RRLOE Team Meeting 3 hrs 3 0 0% 1 day NA 8-Jun 0 No 0 0
SS 8-Jun 2.2.3 RRLOE Communication Overhead 4 hrs 4 0 0% 2 days NA 9-Jun 0 No 0 0
SS 8-Jun 3.1.5.3.1 Requirements document review 2 hrs 2 0 0% 4 days NA 11-Jun 0 Yes 120 0
SS 10-Jun 2.3.1 RRLOE/GZAPS Map Study 4 hrs 4 0 0% 2 days NA 11-Jun 0 Yes 240 0
SS 10-Jun 2.3.2 RRLOE/GZAPS Map Meeting 2 hrs 2 0 0% 1 day NA 10-Jun 0 Yes 120 0
SS 10-Jun 2.3.4 RRLOE/GZAPS Map Construction 2 hrs 2 0 0% 1 day NA 10-Jun 0 Yes 120 0
SS 12-Jun 4.4.7 Review User Manual 2 hrs 2 0 0% 1 day NA 12-Jun 84 No 0 0
SS 12-Jun 8.1.2 HLA Initial Version 6 hrs 6 3.75 100% 3 days 11-Jun 14-Jun 0 No 0 0
SS 13-Jun 6.3.1 P5 class structure 20 hrs 20 17.58 100% 4 days NA 16-Jun 0 Yes 1200 1200
SS 14-Jun 4.5.6 Review Proto 4 document 2 hrs 2 0 0% 1 day NA 14-Jun 92 No 0 0
SS 17-Jun 6.4.1 Database interface 6 hrs 6 26 100% 1 day NA 17-Jun 127 Yes 360 360
SS 17-Jun 8.2.2 HLA Draft Version 6 hrs 6 0 0% 2 days NA 19-Jun 0 No 0 0
SS 18-Jun 6.4.2 Class method 6 hrs 6 4.5 100% 1 day NA 18-Jun 131 Yes 360 360
SS 20-Jun 6.6.3 Copy and Edit 6 hrs 6 5 100% 4 days NA 23-Jun 124 Yes 360 360
0 10-Jun 10 Customer Meeting Rollup 27 hrs 0 0 100% 23 days NA 2-Jul 0 No 0 0
0 20-Jun 4.2.2 Review SRS Main Document 1 hr 1 0 0% 1 day NA 20-Jun 0 No 0 0
0 12-Jun 8.1 HLA Initial Version Rollup 12 hrs 0 0 100% 3 days NA 14-Jun 0 No 0 0
SS 22-Jun 9.1.2 High Level Design, Initial Meeting 3 hrs 3 0 0% 1 day NA 23-Jun 0 No 0 0
0 22-Jun 9.1 High Level Initial Design Meeting Rollup 9 hrs 0 0 0% 1 day NA 23-Jun 170 No 0 0
SS 23-Jun 9.3.1 HLD Draft Version 6 hrs 6 0 0% 1 day NA 24-Jun 0 Yes 360 0
SS 30-Jun 6.8.2 Integration 9 hrs 9 3.17 100% 2 days NA 1-Jul 143 Yes 540 540
ZS 29-May 1.11 Team Lead overhead 20 hrs 20 27 90% 28 days NA 25-Jun 0 No 0 0
ZS 29-May 1.6 Overhead 20 hrs 20 27.5 90% 28 days NA 25-Jun 0 No 0 0
ZS 29-May 3.1.2 Preparation for the Data Model presentation 2 hrs 2 1 100% 1 day 16-Jun 29-May 0 No 0 0
ZS 29-May 3.1.3.6 GZAPS 1.0 Presentation 3 hrs 3 2.5 100% 1 day 16-Jun 29-May 0 Yes 180 180
ZS 29-May 3.1.5.1.1 Communication with Dave 3 hrs 3 0.5 100% 5 days 16-Jun 2-Jun 0 No 0 0
ZS 29-May 3.1.5.1.3  Dave’s Data Model Review 4 hrs 4 4 100% 5 days 16-Jun 2-Jun 0 Yes 240 240
ZS 29-May 3.1.5.4.1 GZAPS 1.0 maintenance 3 hrs 3 6 100% 1 day NA 29-May 0 No 0 0
ZS 29-May 3.1.5.4.2 GZAPS 0 maintenance 1 hr 1 0 0% 1 day NA 29-May 0 No 0 0
ZS 30-May 3.1.4.2 Data Model review meeting 6 hrs 6 1.5 100% 1 day 11-Jun 30-May 0 No 0 0
ZS 30-May 3.1.4.3 Data Model revision to 0.2 2 hrs 2 3 100% 1 day 11-Jun 30-May 0 No 0 0
ZS 30-May 3.1.4.5 Meeting with KD 3 hrs 3 4 100% 1 day 11-Jun 30-May 0 No 0 0
ZS 30-May 3.1.4.7 Data Model revision to 0.3 2 hrs 2 0 0% 2 days NA 31-May 0 No 0 0
ZS 3-Jun 3.1.5.2.1  Communication with Dave 3 hrs 3 1.5 100% 5 days 11-Jun 7-Jun 0 Yes 180 180
ZS 3-Jun 3.1.5.2.3  Data Model Review 1 hr 1 1 0% 5 days NA 7-Jun 0 No 0 0
ZS 3-Jun 3.1.5.2.4 Data Model Revision to 1.0 4 hrs 4 0 0% 5 days NA 7-Jun 0 No 0 0
ZS 6-Jun 2.1.1.2 RRLOE Initial Meeting 3 hrs 3 2.5 100% 1 day 11-Jun 6-Jun 0 No 0 0
ZS 8-Jun 2.2.2 RRLOE Team Meeting 3 hrs 3 0 0% 1 day NA 8-Jun 0 No 0 0
ZS 8-Jun 3.1.5.3.2 Requirements document review 2 hrs 2 0 0% 4 days NA 11-Jun 0 No 0 0
ZS 8-Jun 3.1.5.3.3 Requirements document revision to 1.0 2 hrs 2 0 0% 4 days NA 11-Jun 0 No 0 0
ZS 10-Jun 2.3.3 RRLOE/GZAPS Map Meeting 2 hrs 2 0 0% 1 day NA 10-Jun 0 No 0 0
ZS 13-Jun 6.2.1 Review P4 code 6 hrs 6 1 100% 1 day 16-Jun 13-Jun 0 No 0 0
ZS 15-Jun 8.3.4 Architecture Presentation Meeting 4 hrs 4 0 0% 2 days NA 17-Jun 0 No 0 0
0 10-Jun 10.1 Prototype 4 Demo Meeting Rollup 15 hrs 0 0 100% 1 day NA 10-Jun 0 No 0 0
ZS 17-Jun 6.2.2 Update P4 10 hrs 10 23.5 100% 3 days NA 19-Jun 125,127 Yes 600 600
ZS 19-Jun 8.4.3 Architecture Draft Review 2 hrs 2 0 0% 1 day NA 20-Jun 0 No 0 0
ZS 21-Jun 9.2.1.2 HLD Initial Version 8 hrs 8 0 0% 1 day NA 22-Jun 0 No 0 0
ZS 22-Jun 9.1.3 High Level Design, Initial Meeting 3 hrs 3 0 0% 1 day NA 23-Jun 0 No 0 0
ZS 24-Jun 6.7.1 Populate Dabase 5 hrs 5 8 100% 1 day 16-Jun 24-Jun 124 No 0 0
ZS 23-Jun 9.3.2 HLD Draft Version 6 hrs 6 0 0% 1 day NA 24-Jun 0 No 0 0
                             
        3 hrs 3 2 100%     10-Jun 98   0 0