Gryphon: Internal Information

 

This page is the root for up-to-date internal information on the Gryphon Project. Everyone is responsible to keep the descriptions relevant to their work up-to-date and informing the others of the changes.

Last updated on 11th August 2000. Added Link to the Project Postmortem.

Project completed on 9th August, 2000. All action items and issues closed/binned. Zia


Index

o       Open Action Items

o       Open Issues

o       Administrative

o       Introductory AQP Documentation

o       Process

1.      Requirements

2.      Risk Management

3.      Project Postmortem

4.      Coding Standard

5.      Project Plan

6.      Other

o       Product

1.      Data Model

2.      Architecture

3.      User’s Manual

4.      Prototypes

1.      Documentation

2.      Prototype 1 (completed)

3.      Prototype 2 (completed)

4.      Prototype 3 (completed)

5.      Prototype 4 (starting Summer 2000)

5.      Final Product

1.      Developer Notes

o       Customer Supplied Documents


Current Risks (Top 5)

Last Updated: (31st May 2000, smzia@cs.cmu.edu)

 

Risk Statement

(risk;impact)

Likelihood

Impact

Tracking

Mitigation Strategy

Two different teams (we and Dave) are working on the project concurrently – on two copies of the same data model that needs to be integrated by June 10th; the two teams may have evolved separately into incompatible forms.

H

H

Communication with Dave

Get Dave’s latest SQL scripts through KD. Find out the things that can’t be done in Erwin. Send the explanation back to Dave and ask him to change his data model so that it can be incorporated to ERWin. Get the Dave’s new SQL script back and reverse engineer it in ERWin. If problems are faced then just do the best guess strategy and update the data model in ERWin. This would be the final data model  to be used by Dave and Gryphon.

Customer and team have different “pictures of success” / priorities; there is a significant potential for conflict when deciding on the progress of the project.

M

H

Customer feedback

Continual negotiations

We have gotten bogged down in process, scoping and analysis; this could continue to happen.

M

H

Monitor process vs. development time

Adjust tasks if we do too much process work

Caught between customer needs and pressure to reduce scope – both realistic issues; Might take on more than we can deliver.

M

M

Customer feedback/attendance at meetings

Continual negotiation

 


People

Designation

Name

email

Phone

QA Manager

Bob Lindman

blindman@cs.cmu.edu

268-6420

Development Manager

Steve Schirripa

stevers@cs.cmu.edu

268-3759

Process Manager

George Tsang

get@cs.cmu.edu

268-3816

Planning Manager

Andy Zhou

andyz@cs.cmu.edu

268-8332

Team Lead

Zia Syed

smzia@cs.cmu.edu

268-3082

Support Manager

Sid Kaul

kaulsid@cs.cmu.edu

268-5545

Mentor

Cliff Huff

cch@sei.cmu.edu

268-7605

Mentor

Anthony Lattanze

lattanze@cs.cmu.edu

268-3728

Client

KD Vandrie

 

 


Documents

Administrative

Introductory

Process

Requirements Documents

Risk Management Documents

Coding Standard

Project Postmortem

Current Cycle:

Cycle 6 Project plan

1.      Todo (Text version)  (Html version)

2.      Earned Value (Chart)

3.      Earned Value (Text)

4.      Cycle 6

 

Previous Cycles:

Cycle 5 Project plan

1.      Todo (Text version)  (Html version)

2.      Gantt Chart

3.      Earned Value (Chart)

4.      Earned Value (Text)

5.      Cycle 5

 

Cycle 4 plan and tracking data

1.      ToDo

2.      Gantt Chart

3.      Earned Value (Chart)

 

Other

Product

Data Model

Architecture

User’s Manual

·        User’s manual (25 May 2000, kaulsid@cs.cmu.edu)

Prototypes

Documentation

·        Building new Curriculum v0.1.9 (10 April, 2000 annej@andrew.cmu.edu )

Prototype 1
Prototype 2
Prototype 3

·        Prototype 3: Completed. In VSS

Final product

Developer Notes

August 4, 2000 Deliverables

Updated 25th July, 2000

Deliverable

Status

Person Responsible

Data Model

·        GZAPS Data Model v 2.0 ( ERWin format)

·        Data Model Documentation (HTML format)

 

Zia

Zia

 

Zia

Requirements Document

  • Curriculum Data Model Requirements Document
  • P1-P5 feature Documents

 

 

Bob

Zia

 

Bob

Final Product

 

Steve

Utilities

  • Popuplator 0.4
  • FillGzaps

o       GzapsCatalogData.xls

 

 

Steve

Zia

Zia

User Manual Template

 

Sid

HLA Document

 

Steve

HLD Document

 

Steve


Related Links

Customer Supplied Documents


Stock Quote

Gryphon is traded under the NASDAQ symbol GPHN

Date

Open

High

Low

Last

Change

Volume

07/25/00

11.72

12.22

5.82

6.47

-5.25

82700

 


Gryphon Fund

Last Updated: 5th August, 6:45 pm, (smzia@cs.cmu.edu)

 

Name

“Contribution”

Due

Bob

11

0

Zia

7

0

Steve

3

0

Sid

29

0

Andy

9

0

George

7

0

Total

66

 