Status History
From ZenWiki
The following graph represents a simplified version of the plan Team Zen is currently planning to working to, from a component-based perspective.
Description:
- The component names on the left represent all major components that must be built in the system.
- Cells filled with green represent completed work.
- Cells filled with red represent work that was supposed to be complete as per the plan but is still pending.
- The thick black vertical lines on the graph represent major milestones. The thin black vertical lines represent minor milestones.